Crisis response

Humanitarian mapping in numbers: 16,442 Tasking Manager projects, 2012–2026

Crisis response · · Published 2026-11-21 · Updated 2026-11-21

When an earthquake, a flood or an epidemic hits a place that is poorly mapped, volunteers around the world open a browser and trace buildings and roads from satellite images, so that responders know where people live. Most of that work is coordinated in one tool, the Humanitarian OpenStreetMap Team's Tasking Manager. We downloaded the list of every public project it holds and counted them year by year. The result shows a volunteer system that grew for a decade, peaked in 2024, lost almost two thirds of its new projects in 2025 and is now doing more emergency work than ever with fewer projects.

Key figures

What the Tasking Manager is, and what we counted

The Tasking Manager splits an area that needs mapping into small squares, so that hundreds of people can work at once without tracing the same building twice. One volunteer maps a square in OpenStreetMap; a more experienced one checks it. A "project" is one such area, opened by an organisation such as HOT, a Red Cross society, Médecins Sans Frontières or a national OpenStreetMap community, with a priority level chosen by its manager: low, medium, high or urgent.

The public Tasking Manager lets anyone browse these projects,, and its public API can export the project list as CSV. We downloaded that list on 21 November 2026: 16,453 projects with the status "published" (still open) or "archived" (closed). Drafts are not public, deleted projects are gone, and we removed 11 projects flagged as sandbox tests. The tool's own counter, which includes drafts, showed 18,470 projects, 6,151,357 mapped squares and 566,477 registered mappers on the same day.

Ten years of growth, then a break

Tasking Manager projects created per year, 2012 to 2026Bar chart. Projects created per year rise from 30 in 2012 to a peak of 2,099 in 2024, fall to 780 in 2025 and reach 1,038 in 2026 up to 21 November. The darker part of each bar is projects marked urgent.05001,0001,5002,000’12’13’14’15’16’171,329’18’19’201,985’21’22’23’242,099’25780’261,038all projectsmarked urgent2026: to 21 November
Projects created in the HOT Tasking Manager each year, by date of creation. Source: Tasking Manager project list, extracted 21 November 2026. Chart: The Working Commons, free to reuse with a link to this page.

The curve follows the history of humanitarian mapping. Open mapping took off after the 2010 Haiti earthquake, and the Missing Maps project, launched in November 2014 by the American Red Cross, the British Red Cross, MSF and HOT, set out to map vulnerable places before a crisis rather than during it (see the OpenStreetMap wiki page on Missing Maps). The number of new projects passed 1,000 a year in 2017 and reached 1,985 in 2020, the first year of the pandemic.

In 2020 HOT was also selected by the Audacious Project, a philanthropic initiative linked to TED, which says that "over the next five years HOT will engage one million volunteers" to map places home to a billion people across 94 countries. That five-year horizon ended in 2025, the year the count of new projects fell from 2,099 to 780.

The data cannot tell us why. Two factors are documented. The end of that funding cycle is one. The other is the dismantling of the US Agency for International Development in early 2025. On the OpenStreetMap community forum, a HOT staff member wrote in March 2026 that "HOT's funding was affected by USAID closure, but only by a couple of percent", but that "our pathways for future funding were" hit, and that HOT's funding "had been largely made up of Audacious funders 2020-2025" (thread on the impact of US foreign aid cuts). Fewer funded mapping programmes means fewer projects opened, whatever the number of willing volunteers.

Fewer projects, more emergencies

The fall in 2025 did not touch emergency work in the same way. Projects marked urgent went from 102 in 2024 to 86 in 2025 and 123 in 2026, so their share rose from 4.9% to 11.0% and then 11.8%. In other words, the routine, preventive mapping that fills most years shrank, while disaster activations carried on.

The titles of the 2026 urgent projects read like a news digest: "DRC Ebola 2026" projects for residential areas around Bunia and Mongbwalu, a series on the Venezuela earthquake, Mozambique floods in January and February, Nepal floods in September, a hailstorm in Zimbabwe in October, and on 21 November a new "Response to the 2026 Colombia earthquake" project for a district of Pereira. The Democratic Republic of the Congo stands out over the whole period: 55 urgent projects in 2018, the year of the Ebola outbreak in North Kivu, and 38 in 2026.

This is how the system is meant to work. After Hurricane Dorian in 2019, NPR reported that "107 volunteers from around the world" drew "more than 1,600 roads and 9,000 buildings" in five days for the Abaco Islands (NPR, October 2019). After the earthquakes of 6 February 2023 in Türkiye and Syria, the UN's own volunteer community added 17,700 buildings in a few hours on 10 February (UN Maps), alongside a much larger effort run with the Turkish community Yer Çizenler, documented on the OpenStreetMap wiki.

Where the projects are

Since 2012, the countries with the most projects are Nigeria (1,466), the Democratic Republic of the Congo (794), Tanzania (792), Uganda (730) and Guatemala (549). The map has shifted since: in 2026 the leaders are Mexico (105), Colombia (87), Namibia (61) and Peru (58), and the most active organisation is the Open Mapping Hub for Latin America and the Caribbean, with 302 of the year's 1,038 projects. HOT's regional hubs were part of its plan to move decisions closer to local communities; in 2026 they and national groups open more projects than HOT's global team. A project can cover several countries, and 229 projects have no country recorded.

How many get finished

Of the projects created in 2024, 74.4% are fully mapped and 51.5% fully validated. The gap between the two figures is the bottleneck volunteers often describe: tracing is easy to learn, checking takes experienced people, and there are fewer of them. For 2026 the validated share is only 35.5%, but 637 of those projects are still open. The median number of contributors per project has stayed between 20 and 40 in most recent years, which says more about how projects are sized than about how many people take part.

Why it matters for volunteer networks

Humanitarian mapping is the clearest example of what our article on online volunteers in Kenya's 2007–2008 crisis describes in an earlier form: people far away doing useful, checkable work for responders on the ground. Its numbers show the fragility of that model too. Volunteers are free, but the coordination, the imagery, the validation and the local partners are not, and when funding moves, project counts move with it. Groups that depend on online contributors can learn from it, as we discuss in our pieces on keeping a record of a community's work and on including people who are rarely online.

Method, data and reuse

Source. Project list of the HOT Tasking Manager, exported through its public API on 21 November 2026 (statuses "published" and "archived", 16,453 rows; 11 sandbox projects removed, 16,442 kept). Totals of projects, mapped squares and mappers: the Tasking Manager's public statistics on the same day. The project list includes the names of the people who created projects, so we do not republish it; anyone can download it again from the Tasking Manager.

Method. Projects are counted by year of their creation date. "Urgent" is the priority recorded today, which managers can change; the priority field shows almost no urgent projects before 2016, which may reflect older versions of the tool rather than an absence of emergencies. "Fully mapped" and "fully validated" mean 100% of the project's squares. Figures for 2026 run to 21 November and include open projects. We describe project titles as written by their managers and did not check each event.

Download. Projects per year, 2012–2026 (CSV): projects, urgent and high priority, median contributors, shares fully mapped and validated, projects still open. Aggregated figures compiled by The Working Commons. Free reuse with a link to this page.

Page published and updated on 21 November 2026. The Working Commons is independent of HOT and of the organisations named here.